FILE – This Nov. 3, 2015 file photo shows the Keystone Steele City pumping station, into which the planned Keystone XL pipeline is to connect to, in Steele City, Neb. Pipeline sponsor TC Energy says it has started preliminary work along its route through the U.S. as opponents wait for a judge to rule on their request to block the project. (AP Photo/Nati Harnik, File)

Canadian firm starts US prep work for Keystone XL pipeline

Opponents await a judge’s ruling on their request to block any work

A Canadian company said Wednesday it has started preliminary work along the route of the proposed Keystone XL oil sands pipeline through the U.S. in anticipation of starting construction next month, as opponents await a judge’s ruling on their request to block any work.

TC Energy spokeswoman Sara Rabern said the Calgary-based company was moving equipment this week and will begin mowing and felling trees in areas along the pipeline’s 1,200-mile (1,930-kilometre) route within the next week or so.

The work is planned in Montana, South Dakota and Nebraska, Rabern said. She did not provide further location details.

ALSO READ: U.S. judge blocks construction of $10-billion Keystone XL pipeline

In April the company plans to begin construction at the line’s border crossing in northern Montana. That would be a huge milestone for a project first proposed in 2008 that has since attracted bitter opposition from climate activists who say fossil fuel usage must be curbed to combat global warming.

The company also plans work next month on employee camps in Fallon County, Montana and Haakon County, South Dakota.

Environmental groups in January asked U.S. District Judge Brian Morris to block any work. They said clearing and tree felling along the route would destroy bird and wildlife habitat. The judge in December had denied a request from environmentalists to block construction because no work was immediately planned.

The request by environmentalists came days after the Trump administration approved a right-of-way allowing the $8 billion line to be built across federal land.

ALSO READ: Alberta still pushing for Keystone XL pipeline after U.S. stoppage

“It is irresponsible for TC Energy to jump the gun before Judge Morris rules on our motion,” Stephan Volker, an attorney for the Indigenous Environmental Network and North Coast Rivers Alliance, said Wednesday.

Keystone XL was rejected twice under former President Barack Obama over worries it could make climate change worse.

The pipeline would transport up to 830,000 barrels (35 million gallons) of crude oil daily from western Canada to terminals on the U.S. Gulf Coast.

President Donald Trump has been a strong proponent. The Republican issued a special permit for the pipeline last year after Morris had blocked the project in November 2018, citing potential spills and other environmental concerns.

A legal challenge to Trump’s permit is pending before Morris.

ALSO READ: South Dakota Keystone XL opponents point to N. Dakota spill

Another oil pipeline in TC Energy’s Keystone network in October spilled an estimated 383,000 gallons (1.4 million litres) of oil in eastern North Dakota. Critics say a damaging spill from Keystone XL is inevitable given the length of the line and the many rivers and other waterways it would cross beneath.

Matthew Brown, The Associated Press

Like us on Facebook and follow us on Twitter

Keystone XL

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Aldergrove man battles ‘really scary’ stage four cancer diagnosis amid COVID-19 crisis

Luke Harris and girlfriend Ashley says it was initially a struggle to be taken seriously by ER staff

LANGLEY PLEASE SHARE: Hope for…

Let’s show the world that Langley is a united community filled with love and hope

Human rights complaint over Langley Pride flag tossed out

Kari Simpson’s attempt to block Langley City’s flag raising has failed

VIDEO: Coyotes sign Tendeck

Vancouver Giants netminder inks three-year deal

Painful Truth: No baby boom coming out of coronavirus quarantines

Deferred births and lower immigration are likely outcomes of COVID-19

VIDEO: B.C. singer creates frontline workers tribute song

Cambree Lovesy’s song saluting those battling COVID-19 draws interest online

COVID-19 death toll reaches 50 in B.C., while daily case count steadies

B.C. records 34 new cases in the province, bringing total active confirmed cases to 462

Researchers to study whether plasma of recovered patients can treat COVID-19

Plasma is the liquid portion of the blood that contains the antibodies that protect against illness

B.C., Alberta health ministers urge public to stay home Easter weekend

Regional politicians, online petition calling for closure of provincial border to non-essential traffic

Abbotsford prison has confirmed COVID-19 case

Pacific Regional Treatment Centre is the third prison in B.C. in one week to confirm case

B.C.’s COVID-19 rent supplement starts taking applications

$300 to $500 to landlords for April, May and June if eligible

Canadian Olympian diagnosed with heart failure, possible exposure to COVID-19

Olympic soccer star Karina LeBlanc diagnosed with pleural effusion

Most Read