Skip to content

Here is your $100K study on Old Yale Road

Editor: The Township of Langley is now considering spending $100,000 to study a few pot holes.

This is insanity taken to a new level. The fix of Old Yale does not need study as many of the existing 87 individual concrete panels are in excellent shape. A few need to be replaced.

Use the $100,000 and replace a few panels with money left over.

Put removable pavers where pipes are buried.

This is the executive summary of your $100,000 study.

Wally Martin

Langley