Townhouses under construction as part of the Emmaus Place affordable housing project in Langley Township on Nov. 13, 2019. (Langley Advance Times files)

Big January boosts construction activity in Langley Township

The year-to-date construction is almost double last year’s number

Langley Township is still setting a record pace for issuing development permits in 2020, because an incredibly strong start to the year is outweighing a dip caused by the COVID-19 pandemic.

January was a massive month for development permits.

The Township issued permits for $261.4 million worth of construction of all types – industrial, commercial, single-family homes, condos, and townhouses.

That was a huge increase over January 2019, when permits were issued for $37.3 million.

Permit numbers can swing wildly from month to month, as large projects can drive up the overall numbers. But January was especially big for permits in Langley for housing.

The January permits blitz saw permits issued for 995 dwelling units, 940 of them in townhouse or condo developments.

Permits dipped in February, but numbers were noticeably down in March, as the pandemic began to cause business and municipal offices to shut down or send workers home.

In March Langley Township issued permits for just $28.5 million worth of buildings of all types.

That was down from the $115.4 million worth of building permits issued in March of 2019.

It also meant the Township collected a much lower number of fees – just $107,456, down from $1,000,929 in the same month the year before.

April saw a pickup in permits, with $62.1 million issued, down from $150.4 million the year before.

May saw $20.4 million worth of building permits issued, up from $17.4 million in 2019.

Despite the slowdown in permits, the total numbers are almost double the five-year average when it comes to permits for construction in the Township. From January to May, the last month for which statistics are available, the municipality issued permits for almost $400 million worth of construction, while the five-year average is just above $200 million.

In terms of dwelling units, if every permit is utilized (some projects fail to take off and may not be built) a total of 1,284 housing units would be created from permits issued just in the first five months of 2020. Of those, 1,073 would be in townhouses and condos, and just 105 would be single-family houses. Another 92 are secondary suite permits and 14 are for mobile homes.

A full 89 per cent of housing units would be in Willoughby. In 2019, 78 per cent of all housing units were created in that neighbourhood.

READ MORE: Mayors facing explosive growth talk transit, roads in Fraser Valley

ConstructionHousingLangleyLangley CityLangley Township

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Aldergrove nine year old starts veggie stand to raise money for his first computer

Lochlan Delmaestro has sold $45 worth of herbs and vegetables in just two weeks

Dinosaurs revived for Langley animatronic auction

More than 500 robot dinosaurs, fossils, and exhibition gear are going on the block Aug. 6

VIDEO: Fire breaks out in RV, spreads to garage of Langley home

Crews remain on site as the investigate the cause and extend of damage

Langley intersections lead Lower Mainland for 2019 car crashes: ICBC data

Stats indicate 200th and 264th Street at Highway 1 prove the most dangerous for crashes

Off-duty cop nabs suspected drunk driver

Call for assistance at Langley incident drew massive police response

Airlines dispute Dr. Henry’s claim they ‘very rarely’ give accurate COVID contact tracing info

Air Canada, WestJet say they provide names and contact information

Airborne hot dog strikes Greater Victoria pedestrian

Police called to 4200-block of Quadra Street for hot dog incident

Mission’s 7-Eleven defaced with racist graffiti

Racist insults attacking Indo-Canadians ‘shocked’ manager

B.C. scientist, 63, protests in trees set to be removed for Trans Mountain pipeline

Tim Takaro is reaching new heights as he tries to stall the pipeline expansion project in New Westminster

Dwindling B.C. bamboo supply leaves Calgary Zoo biologists worried about pandas

Zoo has been trying to send pandas back to China since May

UPDATE: Slow growth for wildfire near Harrison Hot Springs

Fire now burns 12 hectares, grew by 2 hectares overnight

B.C. paramedics responded to a record-breaking 2,700 overdose calls in July

Province pledges $10.5 million for expansion of overdose prevention response

Canada signs deals with Pfizer, Moderna to get doses of COVID-19 vaccines

Earlier in July both Pfizer and Moderna reported positive results from smaller trials

Most Read